Incident 965103 · SPDC · 9 Mar 2023
A 3" BALL VALVE CONNECTED TO A 3" ELBOW, EXTENTED OUT BY A 2" GALVANISHED PIPE WAS INSTALLED AT 12 O'CLOCK POSITION OF THE PIPELINE
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A