Incident 965103 · SPDC · 9 Mar 2023
A 3" BALL VALVE CONNECTED TO A 3" ELBOW, EXTENTED OUT BY A 2" GALVANISHED PIPE WAS INSTALLED AT 12 O'CLOCK POSITION OF THE PIPELINE
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.