Incident 827142 · SPDC · 5 Feb 2023
The Team assessed the spill area, found an opening at the spill point (see figure 1). Upon mechanical exposure of the line, the team observed: • A 300 pound rating of 4"weldneck flange blinded at 12' O'clock position. This is attributed to Third Party Interference (Sabotage). • There was no spill impact
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.