Incident 805729 · SPDC · 25 Dec 2022
PT 1 had a 2'' ball valve installed @ 12 o'clock position by unknown persons for theft purpose. PT2 had a 3' valve installed @ 12 o'clock positiom. the IC points were 11.7m apart. PT1 was a water leak and PT2 was non leak.