Incident 2022/LAR/267 · NAOC · 26 Dec 2022
THE SPILL POINT AREA WAS ON FIRE WHEN THE JIV TEAM GOT TO THE SPILL POINT. THE NAOC FIRE TEAM EXTINGUISHED THE FIRE BEFORE THE COMMENCEMENT OF JIV. UPON EXCAVATION, THE JIV TEAM NOTICED A HAWK SAW CUT OF ABOUT 190MM LONG AT 1-2 0'CLOCK POSITION ON THE PIPELINE.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4” MINI NTA WELL 2T FLOWLINE @ MININTA, ELELE ALIMINI, EMOHUA WEST LOCAL GOVERNMENT AREA.