Incident 2022/NL/LAR/036 · NAOC · 23 Dec 2022
2” ball valve with 2”pipe connection was installed at 12 O’clock position on the facility by unknown persons.
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4” MINI NTA WELL 2T FLOWLINE @ MININTA, ELELE ALIMINI, EMOHUA WEST LOCAL GOVERNMENT AREA.