Incident 2022/LAR/NLI/027 · NAOC · 9 Dec 2022
4” ball valves were installed at 12 O’clock position on two different points on the same line at a distance of about 9.65 meters apart by unknown persons
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.