Incident 738477 · SPDC · 13 Nov 2022
• a failed 2’’valve with 2’’elbow pipe running out at 12 O’clock position was connected illegally to the pipeline. • The spill point was a leaking point and close to a previous clamped point. • The Environmental impact of the spill was within SPDC’s ROW
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State