Incident 2022_686379 · SPDC · 17 Oct 2022
• There was an illegal installation of 3’’ valve connected to 3’’ pipe on a section of the pipeline at 12 O’clock position and also, confirmed as a non=leaking point. ROW (see figure 1). • No Spill impact was recorded
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State