Incident 2022/LAR/144 · NAOC · 26 Aug 2022
2 incident points (within 100m apart)were seen on the facility. 1. 2" ball valve with 2 galvanized pipe was installed on the facility by unknown person (s). 2.140mm Hacksaw cut was observed on the facility at 10-12 o clock position caused by unknown person ( s). Unknown person (s) set the incident point on fire.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4” MINI NTA WELL 2T FLOWLINE @ MININTA, ELELE ALIMINI, EMOHUA WEST LOCAL GOVERNMENT AREA.