Incident 2014_1086904(B) · SPDC · 11 Dec 2013
i. The incident featured 3 bunkering points. All 3 of them were arranged serially, and the arrangement spanned 64cm: 32cm between the 1st and the 2nd, and another 32cm between the 2nd and the 3rd. ii. All 3 bunkering points sat at the 12 o'clock position on the pipeline. iii. One of the 3 bunkering point fitting was a 3" valve, with the other 2 being 2" valves. iv. The surrounding area of the spill location featured thick green vegetation. v. No spill occurred, and no impact to the environment.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.