Incident 2014_1298530 · SPDC · 3 Dec 2014
Hacksaw cut on the pipe line at 12-2 o'clock position and there was local boom to contain the spill.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma