Incident 2014/009 · TOTAL · 7 Oct 2014
There was a hacksaw cut @ 12 O'clock on the 4'' OB33/94 flowline along Idu road. the spill affected the vegetation due to the high pressure of the material spilled.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.