Incident 493549 · SPDC · 30 Jun 2022
The spill point was a drilled hole of 12mm in diameter at 12 O’clock position, and water was gushing out meaning the line had been flushed before the arrival of the Joint Investigation Team (JIT).
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State