Incident 2014/LAR/186/687 · NAOC · 12 Sept 2014
• 3” Ball valve was installed on the pipeline at the 12 O’ Clock position by suspected bunkers
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.