Incident 2014_1228149 · SPDC · 7 Aug 2014
two bunkering points with one, an 8"ball valve and a welded flange separated at a distance of 8m apart where installed on the pipeline at 12 o'clock position, one of the two points is non-leaking. the impact was within and outside ROW.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE