Incident 2022/LAR/032/044 · NAOC · 20 Mar 2022
Unknown persons cut and carted about 155.9 m lenght og the flowline using oxygen acetelyne cutting instrument. Despite heavy security presence nearby in the manifolds, assailants wasn't detected. Spray from the line impacted nearby vegetation. impact was minimal at the time of JIV.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU
6" OLEH 3 L/S FLOWLINE CLUSTER AT OLEH
10'' KWALE - AKRI PIPELINE AT AGWE-ETITI