Incident 2022_3085292 · SPDC · 22 Feb 2022
• a 4’’ ball valve with 3’’ pipe installation at 12 O’clock position was connected illegally to the pipeline (see figure 2). • the spill point was a non-leaking point (see figure 2). • No environmental impact recorded since it was a non-leaking point.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE