Incident 2022_3085295 · SPDC · 22 Feb 2022
• a 4’’ ball valve with 3’’ pipe installation at 12 O’clock position was connected illegally to the pipeline. • the spill point is a non-leaking point . • No environmental impact recorded since it was a non-leaking point.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State