Incident 3083515 · SPDC · 1 Feb 2022
THERE WAS A 3" BALL VALVE CONNECTED TO 36' SPDC PIPELINE. THE LEAK WAS CAME FROM THE THIRDPARTY LINE 5 METERS AWAY FROM THE INCIDENT POINT. THE SPILL AFFECTED LAND AND THE CREEK WITHIN AND AROUND THE AREA.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.