Incident 2990851 · SPDC · 8 Jul 2021
THERE WAS A 3" BALL VALVE CONNECTED TO THE 36" SPDC PIPELINE . THIS CONNECTION WAS NOT LEAKING AS AT THE TIME OF JIV. THOUGH DURING THE REPAIR'S DITCH PREPARATION, THE JIT OBSERVED FREE PHASE CRUDE SEEPING OUT FROM THE SUBSOIL.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State