Incident 3084232 · SPDC · 8 Feb 2022
It was observed that the site was a recently Remediated area with windrows. The point was exposed and was discovered that an earlier capped illegal non-leaking connection was seen. The capped 2" nipple was installed @ 12 O' Clock position on the 20" new Kolo-creek pipeline. There was water seepage at the welded joint on the new 20" Kolo-creek pipeline as at time of JIV. it was concluded by the JIT that the cause of leak was a failed illegal connection, third party interference crude oil theft. The point was backfilled, awaiting repair.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.