Oil spills / BY,RI / Incident 2022/LAR/007/010
confirmed

Oil Spill at Oshie 15S Flowline at Akinima Community

Incident 2022/LAR/007/010 · NAOC · 27 Jan 2022

Back to explorer
NOSDRA Oil Spill Monitor · source recordLatest observation: 27 Jan 2022Retrieved: 4 Nov 2026
Incident date27 Jan 2022Source field: incidentdate
Estimated quantity2 bblAn estimate where the source supplies one
Quantity recoveredNot suppliedNot assumed to be zero
Evidence7Source attachment links

Incident location

5.10389, 6.47867
Oil spill

Source fields in plain language

CompanyNAOC
Reported27 Jan 2022
StateBY,RI
LGAYenagoa
ContaminantCo
CauseSabotage / theft
FacilityFl
HabitatLa
Estimated spill area0.00035415
JIV date28 Jan 2022

Impact description supplied by source

• 3NOS Hacksaw cuts were observed on the flowline • There was visible oil spills on the facility (flowline) and around the spill point as at the time of arrival of the joint investigation team (JIT), • Pool of Condensate was observed around the spill point • There was no excavation upon exposure of spill point as the facility (flowline) is surfaced, • The joint investigation team (JIT) observed a 3 NOS 90mm long Hacksaw Cut and drilled holes at about 5’O clock to 7’ O clock position on the Oshie 15s flowline by Unknown persons, • There was visible impact of stained vegetation and pool of oil scattered by the bush paths, observed within NAOC right of way during walk through. • There was evidence of Fire Burnt vegetation observed during walk through

Record timeline

Incident recorded

27 Jan 2022

Report date

27 Jan 2022

Joint Investigation Visit

28 Jan 2022

Spill stop date

Not supplied

Evidence & documents

Attachments are linked from the source record. Open them on the official monitor.

PIC SHOWING SPILLL POINT

Open official source file

PICS SHOWING BURNT FLOWLINE

Open official source file

PICS SHOWING BURNT TREES AND VEGETATION

Open official source file

PICS SHOWING POOL OF OIL

Open official source file

JIV FORM PG1

Open official source file

View all evidence
Source language retained. A confirmed record means confirmed in the source dataset; it is not an independent legal finding by this website.

Explore related records

Continue through records connected by state or company. Similar records do not necessarily describe the same event.

All BY,RI recordsNAOC records2022 oil spills
Jul 2026
2026/LAR/022/042

11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY

Jun 2026
2026/LAR/017/032

OKPAI 25S WELLHEAD AT BENEKU, NDOKWA EAST LGA

Dec 2025
2025/SAR/085

API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.

Dec 2025
2026/SAR/151

6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.

Nov 2025
2025/LAR/GLI/155

24" AKRI - KWALE GAS PIPELINE AT BENEKU