Incident 3000508 · SPDC · 27 Jul 2021
THERE WAS 2" NIPPLE VALVE INSTALLED ON 14" OKORDIA-RUMUEKPE PIPELINE. THE IC WAS NOT LEAKING AND THE ENVIRONMENT IS NOT DISTURBED AS A RESULT OF THE ACTIVITIES OF THE VANDALS. THEREIS AN ARTISANAL REFINING PLANT LESS THAN 50 METERS AWAY FROM THE INCIDENT POINT. THE AREA IS NOTORIOUS FOR ARTISANAL REFINING.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State