Incident 3012854 · NAOC · 20 Aug 2021
hacksaw cut on the flowline during suspected illegal harvesting of pipeline.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
IMO-RIVERS WELL 65T FLOWLINE AT OWAZA, UKWA WEST L.G.A ABIA STATE
12'' IMO-RIVER DELIVERY LINE A AT OWAZA, UKWA-WEST L.G.A.
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU