Incident 2014_1221605B · SPDC · 28 Jul 2014
A 3mm HACK SAW CUT WAS OBSERVED ON THE 10'' DIEBU CREEK-NUN RIVER DELIVERY LINE AT 10 ' O CLOCK POSITION ON THE FACILITY,SURVEILLANCE IS RECOMMENDED.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI