Incident 2021/LAR/037 · NAOC · 3 Jun 2021
TWO NUMBER HACKSAW CUTS WERE OBSERVED ON THE FACILITY; I) PT1 WITH 160MM CUT FROM THE 12 TO 2 O' CLOCK POSITION; II) PT2 WAS WITH 150MM CUT ON THE 10 TO 11 O' CLOCK POSITION. POINTS 1 AND 2 WERE ABOUT 81M APART. A HEAVY FIRE INCIDENT WAS ALSO OBSERVED BUT WAS SUCCESSFULLY PUT OUT
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.