Incident 2021/LAR/034 · NAOC · 21 May 2021
Upon excavation, a 3" ball valve with pipe connection was seen installed on the pipeline at 12 O' clock position by unknown person(s) for crude oil theft purpose.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.