Incident 2460487 · SPDC · 20 Sept 2019
The excavation was carried out manually and at the point of which the 4" pipeline was exposed, the JIT observed a 15mm hacksaw cut at 10:30 0'Clock position of the pipeline done by an unknown person. There was a spill recorded as at time of JIV. There was an impact within and outside the company's right of way. Repair was done by clamping.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.