Incident 2434155 · SPDC · 22 Aug 2019
Excavation was carried out mechanically by the use of an excavator, and at the point of which the 12" pipeline was exposed , the JIT observed a failed 1" ball valve installed at 12 O' Clock position of the pipeline by an unknown person's for crude oil theft activities. There was a spill recorded as at the time of JIV. There was an impact within and outside company's right of way. Repair was done by clamping of the affected point of the pipeline.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.