Incident 2835839 · SPDC · 18 Jan 2021
THERE WAS A 4" VALVE INSTALLED AT 12 0'CLOCK POSITION ON THE 28" BOMU BONNY PIPELINE AT FREETOWN ANDONI LGA. THOUGH IT WAS REPORTED AS A NON LEAKING POINT, THE JIT CONFIRMED IT LEAKING BECAUSE THERE WAS BUBBLES DURING THE INITIAL SITE INVESTIGATION. HENCE THE JIT CONFIRMED IT AS A LEAKING POINT.