Incident TUCN/PH.D/ON-005/2020 · TOTAL · 30 Aug 2020
Sabotage caused by an Hacksaw Cut on the 12" Pipeline @ 12'0 Clock position.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
AKPO FPSO
OB96 FLOWLINE @ EDE COMMUNITY
OB 87/6 FLOWLINE AT OBAGI COMMUNITY
KP 18.1 OBAGE-RUMUEKPE EXPORTLINE, OML58 OPERATIONAL SITE, ODHIAJE COMMUNITY.