Incident 2019_2524625 · SPDC · 7 Dec 2019
THERE WAS A VISIBLE 6'' VALVE INSTALLATION ON THE PIPELINE AT 12 O'CLOCK POSITION AFTER EXCAVATION. THERE WAS NO IMPACT SINCE IT IS A NON-LEAK POINT.
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma