Incident 2020_2585998 · SPDC · 28 Feb 2020
AFTER EXCAVATION IT WAS OBSERVED THAT A 6'' VALVE WAS INSTALLED ON THE PIPELINE. THERE WAS NO IMPACT SINCE IT IS A NON-LEAK POINT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI