Incident 2020_2478515 · SPDC · 10 Oct 2019
A 4"" GALVANISED PIPE WITH AN ELBOW CONNECTED THROUGH A 3" BALL VALVE WAS FOUND INSTALLED ON THE PIPE LINE AT 12 O' CLOCK POSITION BY UNKNOWN PERSON(s).
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.