Incident 2014_1139648 · SPDC · 13 Mar 2014
THE CLAMP AT THE 10'' DIEBU CREEK - NUN RIVER PIPELINE (RISER) FAILED AND IS BEEN CONFIRMED AS THE SPILL POINT
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma