Incident FID 2365359 · SPDC · 2 Jun 2019
There are 2 installations on the 18" pipeline . A 3" ball valve (leaking) was installed at 12' O Clock position by unknown persons on the 18" Assa Rumuekpe Pipeline @ Egbeda. The second was 3" ball valve none -leaking also @ 12'O clock position
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.