Incident 2018_2081496 · SPDC · 19 May 2018
THERE WAS AN EVIDENCE OF 6'' BALL VALVE INSTALLATION ON THE PIPELINE. ESTIMATED QUANTITY SPILLED NOT RECORDED SINCE IT IS A NON LEAK POINT.
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma