Incident AEEPCO/NCTL/2018/11 · Aiteo E&P · 17 Oct 2018
THERE WAS AN EVIDENCE OF VALVE INSTALLATION ON THE PIPELINE AT 12 O'CLOCK POSITION
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma