Incident 2014_1191812B · SPDC · 5 Jun 2014
(i) No impact was observed on site as at the time of JIV. (ii) The incident featured a 6" pipe extending horizontally from a 8" pipe oriented vertically and connected to a 8" flange, then connected to a 8" valve, then again connected to a 8" flange which finally terminated in the 24" NCTL line. (iii) The illegal fittings sat at the 12 o'clock position on the pipeline. (iv) A cofferdam was observed to have been built around the point of the incident to prevent surface water from disrupting the JIV process.
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.