Incident 2014_1191812A · SPDC · 5 Jun 2014
(i) No impact was observed on site as at the time of JIV. (ii) The incident featured a 6" twin outlet pipe connected to a 6" flange, and connected to a 6" reducing bowl valve, then connected to a 8" flange, and finally terminating in the 24" NCTL line. (iii) The illegal fittings sat at the 12 o'clock position on the pipeline.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.