Incident 2018_2215447 · SPDC · 27 Nov 2018
UNKNOWN PERSON(S) INFLICTED THE FACILITY WITH A DRILLED THROUGH HOLE AND INSTALLED 1'' BALL VALVE AT 12 O'CLOCK POSITION ON THE THE FACILITY.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.