Incident 2018/LAR/154 (B) · NAOC · 6 Dec 2018
2 NOS 80MM LONG HACKSAW CUTS AT 3METERS APART ON THE FLOWLINE AT 9-12 O'CLOCK POSITION EACH
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU
6" OLEH 3 L/S FLOWLINE CLUSTER AT OLEH
10'' KWALE - AKRI PIPELINE AT AGWE-ETITI