Incident 2185038 · SPDC · 15 Oct 2018
THERE WAS A CONCRETE GROUTING ON A PREVIOUSLY CONNECTED THEFT VALVE ON THE 20'' KOLO CREEK PIPELINE. THE SPILL IS ON THE INSTALLED SABOTAGE VALVE. THE SPILL AFFECTED ADJOINING SEASONAL SWAMP WITHIN THE AREA.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
12'' ENYIWEST -ENYIMAIN AT OGWU-IKPELE
4'' SARA DELIVERY LINE AT IDAMA JOKKA COMMUNITY R/S.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A