Incident 2175346 · SPDC · 30 Sept 2018
THERE WAS THEFT POINTS INSTALLED AT 12 O'CLOCK POSITION, 1'' VALVE WAS FOUND 403CM AWAY FROM THE SPILL POINT AND WAS NON-LEAKING AT THE SAME 12 O'CLOCK POSITION. THE SPILL POINT WAS BURNT AS THERE WAS FIRE AT THE SPILL AREA BEFORE THE JIV. THE SURROUNDING FARMS WERE TOTALLY BURNT AND THERE WAS SPLASHES OF CRUDE ON THE VEGETATION OUTSIDE SPDC'S ROW