Incident 2018/GL/LAR/054/084 · NAOC · 23 Jul 2018
Two 90mm hack saw cuts at 4 meters were observed on the flow line. One at 4 O'clock to 7 O'clock position, the other at 5 O' clock to 8 O' clock positions, caused by sabotage.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY
OKPAI 25S WELLHEAD AT BENEKU, NDOKWA EAST LGA
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU