Incident 2018/LAR/020/033 · NAOC · 19 Feb 2018
12MM DRILLED HOLE OBSERVED AT 6'O CLOCK POSITION ON THE 4" FLOW LINE
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU
6" OLEH 3 L/S FLOWLINE CLUSTER AT OLEH
10'' KWALE - AKRI PIPELINE AT AGWE-ETITI