Incident 2018/LAR/080/099 · NAOC · 6 Jun 2018
2 NOs OF HACKSAW CUT WAS OBSERVED ON THE FLOWLINE AT 66.8 METERS APART CAUSED BY UNKNOWN PERSON(S) 40mm LONG HACKSAW AT 5-7 O'CLOCK and 45mm AT 6-8 O'CLOCK POSITIONS RESPECTIVELY.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY
OKPAI 25S WELLHEAD AT BENEKU, NDOKWA EAST LGA
API Obama skimmer@Obamaflowstation in Nembe, Bayelsa state.
6'' Ogboinbiri Deep 5 Flowline at Ogboinbiri, Southern Ijaw LGA Bayelsa State.
24" AKRI - KWALE GAS PIPELINE AT BENEKU