Incident 2014_1163870A · SPDC · 22 Apr 2014
THERE WAS NO SPILL AT THE POINT OF INCIDENT BUT A TEMPORARY SCREW CAPPING WAS OBSERVED. REPAIR WAS CARRIED OUT IMMEDIATELY BY CLAMPING.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
18" Ebocha-Ogoda Pipeline @ Mgbede Community, ONELGA, Rivers State
12'' (km 15.5) OBAGI-RUMUEKPE CRUDE OIL EXPORT LINE @ OBIEMERENYI, AHOADA EAST L.G.A
10”0bob-Ebocha Pipeline at old Obrikom Flowstation, Omoku Community Onelga.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.