Incident 2018_1999540 · SPDC · 10 Jan 2018
THERE WAS AN EVIDENCE OF HACKSAW CUT @ (3-9) O'CLOCK POSITION AND BLAST @ 6 O'CLOCK POSITION
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI