Incident 11508 · TOTAL · 9 Apr 2014
Frac out resulted in escape of Water Based Drilling Mud (WBM) to the surface during HDD. The mud is contained within Pipeline Right of Way.
4" NKALE WELL 13 FLOWLINE@ODOGWA 1, NKALE ETCHE LGA.
4” MINI NTA WELL 2T FLOWLINE @ MININTA, ELELE ALIMINI, EMOHUA WEST LOCAL GOVERNMENT AREA.